Commit Graph

6 Commits

Author SHA1 Message Date
Loic Dachary
55e5160d96 erasure-code: fix bugous ec-rados-default.yaml in some suites
The ec-rados-default.yaml was linked to suites as if it was a task
although it is a workload intended for parallel upgrade tests.

The ec-rados-plugin=jerasure-k=2-m=1.yaml task is defined and used
instead, where relevant.

http://tracker.ceph.com/issues/9549 Fixes: #9549

Signed-off-by: Loic Dachary <loic-201408@dachary.org>
2014-09-21 18:58:43 +02:00
Loic Dachary
a624d44566 erasure-code: do not schedule isa workloads just yet
they should be selectively activated, depending the isa plugin availability

Signed-off-by: Loic Dachary <loic-201408@dachary.org>
2014-08-31 10:47:27 +02:00
Loic Dachary
378113cc89 erasure-code: do not schedule lrc workloads just yet
testing after renaming is in progress

Signed-off-by: Loic Dachary <loic-201408@dachary.org>
2014-08-30 18:31:50 +02:00
Loic Dachary
a019c84f47 erasure-code: add to suites/upgrade/*-x final workloads
And replace the ec-readwrite.yaml custom workloads with links to the
workloads found in the erasure-code directory.

Signed-off-by: Loic Dachary <loic-201408@dachary.org>
2014-08-30 11:18:00 +02:00
Sage Weil
39166b2d34 upgrade/dumpling-x: run dumpling version of s3tests
Signed-off-by: Sage Weil <sage@inktank.com>
2014-04-03 14:22:32 -07:00
Sage Weil
efdee0d31c upgrade/dumpling-x: upgrade final client node for final test
This means the final workloads are running firefly code.

Signed-off-by: Sage Weil <sage@inktank.com>
2014-03-12 15:37:13 -07:00