Commit Graph

401 Commits

Author SHA1 Message Date
Yuri Weinstein
9a631cedf6 Removed branch: firefly from 4-after.yaml
Fixes #15012

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit 872aed9e72)
2016-03-10 13:18:01 -08:00
Yuri Weinstein
9fb577877d Whitelisted 'soft lockup' and 'detected stalls on CPUs'
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit 367bd5b49c)
2016-02-10 08:27:58 -08:00
Sage Weil
117041ef47 Merge remote-tracking branch 'gh/jewel' 2016-02-08 17:26:32 -05:00
Yuri Weinstein
b725fdf547 Made disk size in openstack 40GB, so osd won't run out of space
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit 9e28d21adc7d891a9ad3426170f147164b2778ae)
2016-02-05 10:15:44 -08:00
Yuri Weinstein
0cf150f550 Adde + in the openstack.yaml dir
Fixes failures in #14635

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit d4fd02e9d804d5d5379fc8150ad63d412a9b5d3b)
2016-02-05 10:11:28 -08:00
Yuri Weinstein
183c782271 Whitelisted "wrongly marked me down" for the tiering tests
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2016-02-03 08:47:36 -08:00
Yuri Weinstein
e1faa316ed Whitelisted "soft lockup"
to avoid failures on slow nodes like in #14618

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit 9724dee9d9d2921062d86bbb8fac17c554e7984c)
2016-02-02 15:42:57 -08:00
Yuri Weinstein
58fd981eef Initial draft for infernalis stable upgrade tests
Fixed indentation
Replace ‘description’ with ’meta’
Incorporated Josh's comments
Moved all overrides to the top

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit f9e2851d47d3a2b5910a9d87bb6577ee63546d5e)
2016-01-29 14:09:42 -08:00
yuriw
bef4ef9a2c Added point-to-point suite
Added parallel suite
Added stree-split suite
Added stress-split-erasure-code suite
Added stress-split-erasure-code-x96-64 suite

Signed-off-by: yuriw <yuri.weinstein@gmail.com>
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit e7732cce73af2fed55a957b5529db93e3ff3ea5a)
2016-01-27 14:41:17 -08:00
yuriw
b07a2edd7c Added point-to-point suite
Added parallel suite
Added stree-split suite
Added stress-split-erasure-code suite
Added stress-split-erasure-code-x96-64 suite

Signed-off-by: yuriw <yuri.weinstein@gmail.com>
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit e7732cce73af2fed55a957b5529db93e3ff3ea5a)
2016-01-27 14:40:10 -08:00
Yuri Weinstein
05c678bd5a Whitelisted 'wrongly marked me down'
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2016-01-18 13:25:37 -08:00
Yuri Weinstein
83f6e8194e Added ditros to f-h-x-offline, tiering, v0-94-4-stop tests
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2016-01-12 09:09:14 -08:00
Yuri Weinstein
558fbe296f Removed point-to-point-x test, will need to add jewel specoific later
http://tracker.ceph.com/issues/14339

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2016-01-11 15:46:21 -08:00
Yuri Weinstein
66d244fe8b Removed tests for EOL dumpling clients on jewel clusters
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2016-01-04 09:33:46 -08:00
Sage Weil
5c232b4ed5 Merge remote-tracking branch 'gh/jewel' 2015-11-25 20:07:38 -05:00
Yuri Weinstein
f8fcb67e1f Added infernalis-client-x - fixes #13774
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-11-19 09:36:33 -08:00
Yuri Weinstein
12ba21d0f8 Added %
Fixed intall.upgrade syntax
Whitelisted 'reached quota'

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-11-12 08:05:03 -08:00
Loic Dachary
3e1915857f Merge pull request #684 from dachary/wip-12973
rados: 'failed to encode ...' warnings are normal on upgrades
2015-11-12 15:06:41 +01:00
Yuri Weinstein
978d83d97d Added %
Fixed intall.upgrade syntax
Whitelisted 'reached quota'

Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-11-11 16:19:39 -08:00
Loic Dachary
4cbf177039 rados: 'failed to encode ...' warnings are normal on upgrades
http://tracker.ceph.com/issues/12973 Fixes: #12973

Signed-off-by: Loic Dachary <loic@dachary.org>
2015-11-10 21:28:00 +01:00
Yuri Weinstein
79ba87aaa2 Merge pull request #669 from ceph/wip-13304
client-upgrade: hammer-based test should be used on new client
http://pulpito.ceph.com/teuthology-2015-11-06_08:55:24-upgrade:client-upgrade-hammer-distro-basic-vps/
2015-11-06 09:37:54 -08:00
Jason Dillaman
d918ff023e client-upgrade: hammer-based test should be used on new client
Avoid attempting to test new release features that are not available
on older hammer OSDs.

Fixes: #13304
Signed-off-by: Jason Dillaman <dillaman@redhat.com>
2015-11-06 11:54:10 -05:00
Sage Weil
a4249d381b Merge pull request #648 from ceph/wip-f-h-x-offline
test offline upgrade from firefly -> x

Reviewed-by: David Zafman <dzafman@redhat.com>
2015-10-19 17:08:21 -04:00
Sage Weil
b2ad94076d upgrade/hammer-x/f-h-x-offline: test firefly -> x upgrade
This is an offline (osds all restart) upgrade.

Signed-off-by: Sage Weil <sage@redhat.com>
2015-10-19 15:09:47 -04:00
Yuri Weinstein
1f076d9391 Added one more "write_append_excl: false"
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-10-17 08:27:17 -07:00
Yuri Weinstein
3a13ec04ce Added "write_append_excl: false"
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-10-16 12:02:43 -07:00
Yuri Weinstein
8ae31f1583 Removed osd.6 from roles to fix #13515
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-10-16 10:13:03 -07:00
Yuri Weinstein
b696051431 Added write_append_excl: false to fix #13485
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-10-16 08:29:17 -07:00
Yuri Weinstein
64dcc28e14 Removed /parallel/7-final-workload/rgw_swift.yaml as it was creating the same user as the s3tests run right before
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-10-15 13:55:03 -07:00
Loic Dachary
2747164075 upgrade/stress-split: needs only six OSDs
The large number of OSDs is only needed for LRC or SHEC in some
cases. All other jobs will do fine with six OSDs.

http://tracker.ceph.com/issues/13408 Fixes: #13408

Signed-off-by: Loic Dachary <loic@dachary.org>
2015-10-13 16:20:22 +02:00
Yuri Weinstein
9fdea19361 Specified 'hammer' branch
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
(cherry picked from commit 490dbb28ffa501d7041182332523eb5998d03777)
2015-10-09 13:48:32 -07:00
Sage Weil
21cefaf20d upgrade/hammer-x/point-to-point: whitelist wrongly marked me down
Signed-off-by: Sage Weil <sage@redhat.com>
2015-10-06 16:46:50 -04:00
Yuri Weinstein
37a881aee1 White listed WAR 'failed to encode' fixes #13349
Signed-off-by: Yuri Weinstein <yweinste@redhat.com>
2015-10-03 08:27:39 -07:00
Sage Weil
a0f0194ab2 upgrade/hammer-x/point-to-point: use different client for second rgw
Can't do 2 rgw's on the same client id.

Signed-off-by: Sage Weil <sage@redhat.com>
2015-10-02 13:24:19 -04:00
Sage Weil
7bb1ceb3f0 log-whitelist 'reached quota' for librados test.sh
A new test verifies that we are stopped by the pool quota (and get
the right error messages or block).  See ceph.git
32962740ce.

Signed-off-by: Sage Weil <sage@redhat.com>
2015-10-02 08:33:46 -04:00
Sage Weil
963f5e55a9 upgrade/hammer-x/tiering: fix upgrade sequence
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-30 09:34:26 -04:00
Kefu Chai
d58a0b00e8 add cache tiering test for hammer-x
Signed-off-by: Kefu Chai <tchaikov@gmail.com>
2015-09-27 08:24:38 -04:00
Sage Weil
9e95c7430a upgrade/hammer-x/parallel: set infernalis settings after upgrade
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-24 23:37:35 -04:00
Sage Weil
8087095fa6 upgrade/hammer-x/stress-split-erasure-code-x86_64: specify arch
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-23 15:06:19 -04:00
Sage Weil
1e5b352d08 upgrade/hammer-x: use supported distros, not hard-coded rhel7+trusty
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-22 13:24:34 -04:00
Sage Weil
91b11725ab upgrade/hammer-x: use rgw civetweb
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-22 11:26:29 -04:00
Sage Weil
bc9a66c7f4 upgrade/hammer-x/parallel: clients are hammer to for final workload
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-22 11:26:29 -04:00
Sage Weil
58453d3f55 upgrade/hammer-x/point-to-point: fix x client
- install hammer for hammer->x upgrade
- use hammer branch for workunit

Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-22 11:26:29 -04:00
Sage Weil
1a0f68e0c9 upgrade/hammer-x/point-to-point: upgrade client for final test
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-21 08:17:08 -04:00
Sage Weil
eebd63a7e5 upgrade/hammer-x/point-to-point: use proper hammer test.sh
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-21 08:16:53 -04:00
Sage Weil
daf4f520c0 upgrade/hammer-x/parallel: upgrade client before final workload test
Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-20 21:21:53 -04:00
Sage Weil
09318894a4 upgrade/hammer-x: fix full_sequential indentation
Broken by caa9235857

Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-20 21:14:15 -04:00
Sage Weil
f6a96ad811 upgrade/hammer-x: use eastern tz for all upgrades
Hammer doesn't handle mixed timezones and hit_sets (cache pools)
correctly.  Avoid it.

Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-18 17:31:06 -04:00
Sage Weil
eae42708f8 upgrade/hammer: do ubuntu for point to point
centos packages don't (git)build for these old
releases

Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-18 11:26:30 -04:00
Sage Weil
3fd609f126 upgrade/hammer-x: only ubuntu
the centos packages don't (git)build

Signed-off-by: Sage Weil <sage@redhat.com>
2015-09-18 11:26:30 -04:00