diff --git a/doc/releases.rst b/doc/releases.rst index 3b5c4149f4d..c01dbdf6316 100644 --- a/doc/releases.rst +++ b/doc/releases.rst @@ -21,7 +21,6 @@ Timeline +----------------+-------------+-------------+-----------+-----------+---------------+-----------+------------+------------+------------+-------------+ | | Development | `Luminous`_ | `Kraken`_ | `Jewel`_ | `Infernalis`_ | `Hammer`_ | `Giant`_ | `Firefly`_ | `Emperor`_ | `Dumpling`_ | -| | Testing | LTS | Stable | LTS | Stable | Stable | LTS | LTS | Stable | LTS | +----------------+-------------+-------------+-----------+-----------+---------------+-----------+------------+------------+------------+-------------+ | September 2017 | | `12.2.1`_ | | | | | | | | | +----------------+-------------+-------------+-----------+-----------+---------------+-----------+------------+------------+------------+-------------+ @@ -374,7 +373,7 @@ For each stable release: * The `stable releases and backport team `_ publishes ``point releases`` including fixes that have been backported to the stable release. -In the timeline, the life time of a stable release series is +In the timeline above, the life time of a stable release series is calculated to be approximately 18 months (i.e., two 9 month release cycles) after the month of the first release. For example, Luminous (12.2.z) will reach end of life (EOL) shortly after Nautilus (14.2.0) is @@ -386,6 +385,6 @@ Luminous, only every other stable release was an "LTS" release. Therefore, * Upgrades are supported from Jewel -> Kraken -> Luminous and Jewel -> Luminous. -* Upgrades beyond Luminous must stop at Luminous. -* Jewel will be maintained until Mimic is released in the Spring of 2018. +* Upgrades from Jewel or Kraken must upgrade to Luminous first before proceeding further (e.g., Kraken -> Luminous -> Mimic but not Kraken -> Mimic). +* Jewel will be maintained until Mimic is released in the spring of 2018. * Kraken is no longer maintained.