@ -2,9 +2,9 @@ Purpose
|
||||
=======
|
||||
|
||||
This suite tests upgrades of a ceph cluster from dumpling (current
|
||||
branch) to firefly (current branch), and then to a later specified
|
||||
branch) to giant (current branch), and then to a later specified
|
||||
version (version x, e.g. for example ‘next’ or ‘master’). It runs the
|
||||
last upgrade (steps in 3-firefly-upgrade) in parallel with firefly
|
||||
last upgrade (steps in 3-giant-upgrade) in parallel with firefly
|
||||
client tests.
|
||||
|
||||
|
||||
@ -14,8 +14,8 @@ Structure
|
||||
Generally the flow is:
|
||||
- install dumpling
|
||||
- test it
|
||||
- upgrade cluster and clients to firefly
|
||||
- test firefly while upgrading cluster to version x
|
||||
- upgrade cluster and clients to giant
|
||||
- test giant while upgrading cluster to version x
|
||||
- upgrade clients
|
||||
- test with version x clients
|
||||
|
||||
@ -36,32 +36,32 @@ Installs dumpling and runs correctness tests from the 'workload' section
|
||||
Defines the 'workload' section - correctness tests to run on dumpling
|
||||
“+” is used to construct a single yaml load from all tests in this directory
|
||||
|
||||
3-firefly-upgrade
|
||||
3-giant-upgrade
|
||||
-----------------
|
||||
|
||||
First upgrades everything to firefly. Then upgrades the cluster to
|
||||
First upgrades everything to giant. Then upgrades the cluster to
|
||||
version x while running correctness tests (from the 'workload2'
|
||||
section) on firefly clients in parallel. This upgrade is done by the
|
||||
section) on giant clients in parallel. This upgrade is done by the
|
||||
'upgrade-sequence' section, defined later. Once the cluster is
|
||||
upgraded and these tests complete, upgrades the clients to version x
|
||||
as well.
|
||||
|
||||
Clients are upgraded last to avoid running newer tests that don't work
|
||||
against firefly, and to verify that firefly clients can continue
|
||||
against giant, and to verify that giant clients can continue
|
||||
working with a newer cluster.
|
||||
|
||||
4-workload
|
||||
----------
|
||||
|
||||
Defines the 'workload2' section - correctness tests to run during the
|
||||
upgrade from firefly to version x.
|
||||
upgrade from giant to version x.
|
||||
“+” is used to construct a single yaml load from all tests in this directory
|
||||
|
||||
5-upgrade-sequence
|
||||
------------------
|
||||
|
||||
Defines the 'upgrade-sequence' section - the order in which the
|
||||
upgrade from firefly to version x is done. Note that leaving the
|
||||
upgrade from giant to version x is done. Note that leaving the
|
||||
version unspecified here is what makes it upgrade to version x,
|
||||
which is set as an override when this suite is scheduled.
|
||||
|
||||
|